  1. Staff availability
  • June 5-6: Lynn working offsite (available by e-mail)

 

  1. Primo status
  • Renorm started May 30, incorporating NR changes by Dave Walker & Christina Mune.
  • Cutover prep: Alma data being deleted June 4 from both sandbox and production. 
    • Watch for updates on Basecamp if schedule changes.
  • Change request to move Primo PROD BO and sandbox from http to https
    • Firewall change completed (added port 1443 in addition to prior port 1601)
    • Load balancer is planned to change to https as well
      • If you experience loss of connection, please notify us (in SF)


 

  1. Alma status
  • Cutover is underway and on track for all migrating campuses.
    • Network Zone and Group 1 scheduled for production delivery June 5.
    • Group 2 scheduled for production delivery June 12.
    • Group 3 scheduled for production delivery June 19.
    • Review “Testing Guidelines” doc from Sarina (incl links to Ex Libris testing guides)


 

 

Chat transcript

 

from yvonne:

Q: If we need help to upload our Offline Circ Data into ALMA before go live, to whom we should contact or how to proceed. Thanks.

from yvonne (privately):

OK and thanks!

from Maria Pena to everyone:

Do we upload to ftp site?

from Maria Pena to everyone:

yes

from Brandon (privately):

when is the scheduled jobs list due?

from Maria Pena to everyone:

Ok

from Maria Pena to everyone:

Great, thanks.

from Maria Pena to everyone:

And scheduled jobs list goes to Salesforce?

from Christina (CSUCI) to everyone:

thanks much dolph!

from Mark B (Los Angeles) to everyone:

Thank you Dolph and all

from Alice Kawakami-CSU to everyone:

thanks Dolph

from Jeremy to everyone: