Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Date

Participants

  • Welcome new members

  • Review group projects and assignments

  • Transition to next academic year

Discussion topics

Time

Item

Presenter

Notes

5 min

Welcome new members

All

  • Welcome Azalea Camacho (Cal State LA), Eric Milenkiewicz, (CSUSB)

20 min

Review Digital Collections Development Plan with David and Kevin

All

  • Walk through of DAMS Development Plan for Digital Collections.

  • What is missing?

  • What can be removed or reorganized?

  • What other forms of project management should the plan take in order to effectively guide DC DAMS implementation? Flow Charts? Timeline? Checklists?

  • How communicate the plan to appropriate CSU personnel?

5 min

Committee Orientation

5 min

Introduce Campus Self Assessment

Beth

Campus DAMS self evaluation

  • Helps both individual campuses and provides an overall assessment of needs across entire system.

  • ZOOM meetings with individual campuses to guide through evaluation tool.

5 min

Introduce test server project

Steve, Alyssa, Beth

  • CSUN, CPP, CSUCI to create test servers. CSUSM now trying to work toward a test installation.

  • Consider installing through virtual machines if no dedicated IT or other Tech support. Alyssa considering Reclaim Hosting.

5 min

Introduce DAMS evaluation form

Steve

DAMS performance evaluation tool using functional requirements.

5 min

Introduce Samvera/Fedora for preservation study

Erik

  • An investigation is underway to identify preservation management tasks available to the shared DAMS as configured

  • A workflow and tutorial of recommended preservation tasks pertaining to preservation management

2 min

Introduce Repository communication lists

Steve

  • Repository Personnel Registry

  • New listserv for IR and DC, digrepo@lists.calstate.edu

  • Targeted personnel email group lists (in process).

5 min

Committee annual transition matters

All

  • New member task assignments

  • Is the second Monday of the month at 1 pm still a good time to meet for everyone?

  • Summer meetings - more or less frequent?

3 min

Other news or announcements

All

Action items

  •  

Decisions

  • No labels